The Asdon Group - Design, supply and install - New Offices

Project Info

  • Client:
    The Asdon Group
  • Project:
    Design, supply and install to new offices
  • Contractor:
    O'Prey Ltd.
  • Duration:
    12 weeks
  • Consultant Engineer:

Description

WKK Electrical Services Ltd. were appointed as electrical contractor to design, supply and install new offices for the Asdon Group at their Headquarters in Lisburn. Having acquired an old manufacturing factory, WKK were entrusted with the development of the electrical services to provide a new hi-spec office with Smart technology throughout, from control heating, access and security. The Asdon Group provide Business Technology, Compliance Services and Office products and their new facility now includes offices, workshops and warehousing in one location.

Systems Installed

  • Smart technology app controlled heaters
  • General purpose power services
  • Underfloor busbar systems
  • Data infrastructure
  • Security and fire alarm systems
  • Audio visual wiring
  • Air conditioning wiring