Fane Valley Farm Shop, Armagh

Project Info

  • Client:
    Fane Valley Stores
  • Project:
    New Electrical Installations
  • Contractor:
    Moss Construction
  • Duration:
    4 months
  • Consultant Engineer:
    Architect Noel McLarty ARC ID, SCC Consulting

Description

WKK were appointed by Moss Construction and Fane Valley Group for the complete electrical installations to their new Fane Valley Farm Shop in Armagh.  This was a fast tracked design and build project which involved speedy interpretation of the clients requirements over a 4 month period. All works were completed on time and within budget. 

 

Systems Installed

  • Lighting systems
  • Design and Build Security Systems